Moving Kit
Complete Moving Kit
Your comprehensive guide covering timeline, budget, utilities, and Day-1 safety protocols.
Updated: 2025-11-04
Moving Timeline (T-30 to Day 1)
T-30 to T-21 days (4 weeks out)
- Submit application and get park approval in writing
- Request copy of park rules and lease agreement
- Gather moving quotes (if applicable) or reserve DIY truck
- Confirm move-in date and coordinate with park office
T-20 to T-10 days (2–3 weeks out)
- Schedule utility turn-ons (water, electric, gas, internet)
- Order packing supplies or confirm delivery service
- File change-of-address with USPS and update key accounts
- Notify current landlord/park of move-out date
T-9 to T-1 days (final week)
- Pack fragile items and label boxes by room
- Confirm mailbox setup or cluster box assignment
- Take photos of home's condition (inside and outside) before move-in
- Review parking plan for moving day (large vehicles, helpers)
Budget Template (Monthly)
Use this worksheet to estimate your ongoing monthly costs. See our Hidden Costs guide for surprises to watch for.
| Category | Amount (USD/month) |
|---|---|
| Lot rent | $_______ |
| Utilities (electric, gas, water/sewer, trash) | $_______ |
| Home payment (if financing) | $_______ |
| Insurance (manufactured home policy) | $_______ |
| Maintenance reserve (seasonal, repairs, supplies) | $_______ |
| TOTAL Monthly | $_______ |
Download our budget calculator (CSV) to track actual expenses over time.
Utility Turn-On Checklist
Call each provider at least 2 weeks before move-in. Write down account numbers and confirmation codes.
- Water / Sewer: Confirm if billed through park or separate account. Get meter number and billing cycle.
- Electric: Schedule turn-on for move-in day. Ask about average usage history for the lot.
- Gas (if applicable): Schedule inspection and turn-on. Verify all appliances are gas-ready.
- Internet / Cable: Book installation appointment. Confirm service availability at your lot.
Tip: Label your breaker panel and shut-off valves on Day 1 while systems are fresh in your mind.
Day-1 Safety Protocol
Before you unpack boxes, complete these essential safety checks:
Inside the home
- Smoke alarms: Test each unit. Replace batteries if needed. Verify one in each bedroom and hallway.
- Carbon monoxide alarm: Install or test if you have gas appliances or attached storage.
- Water shut-off: Locate main valve under home and label it clearly.
- Electrical panel: Identify breakers and label circuits (kitchen, HVAC, water heater, etc.).
- Gas shut-off: If applicable, locate valve near meter and ensure you have proper wrench.
Outside & lot perimeter
- Skirting: Walk around home. Note any missing panels, gaps, or damage. Repair quickly to prevent pests and frozen pipes.
- Steps & railings: Test stability. Tighten bolts or replace if wobbly.
- Lot hazards: Remove debris, check for uneven ground, confirm drainage away from home.
- Fire extinguisher: Place one in kitchen and one near exit. Check pressure gauge.
Important: This kit is educational guidance and not legal or code compliance advice. Always consult qualified local professionals for inspections, installations, and permitting.
Next Steps
Continue with our other Moving Kit resources: